Monday, August 16, 2010

More Frequently Asked Questions

Q: What is restorative drying?
A: A few years ago the standard procedure was to remove any wet materials, replacing with new ones. Today, with much better equipment and training, our goal is to dry-out your structure, saving as much of the structure as possible.

Q: How long will the dry-out take?
A: Typically the average water loss takes between 2 to 5 days. If materials have been exposed to water over a long period of time it may take 4 to 7 days.

Q: If it can't be dried, what will be replaced?
A:
Our job is to bring you back to a pre-loss condition. After the dry-out process has been completed, we will be able to determine what has permanent damage.

Response Restoration
Emergency #: 651-470-7027

No comments:

Post a Comment